Description
New construction of a 200,000 GSF composites and wood manufacturing facility with 50,000 GSF office space and showroom. Maxson Engineering and the design team were able to utilize production waste to generate on-site heating water via bio-mass boilers to cut down on energy consumption and product waste.
Project Highlights:
Bio-mass Boiler Heating Water Generator
Central Chilled Water and Heating Water Plants
Process Chilled Water
Central Utility Plant (CUP) Building
High Efficiency HVAC
Process Compressed Air Distribution
Dust Collection
Natural Gas Generator
Paint Line Drying System