Project Type
Chiller Plant Upgrades
Square Footage
30,000
Construction Budget
$18 Million
Project Delivery Mode
Design–Build
Description
Maxson Engineering was the Prime Consultant for the replacement of the existing antiquated chilled water plant in the basement of the Sheraton Downtown Denver Hotel. The project required detailed design and planning to allow for new 1000-ton chillers to be constructed in place. The existing building conditions created a limitation that all equipment to be capable of being moved through a 6 ft. wide door.
Project Highlights:
Expansion of Chiller Plant
DDC Control Modifications
Pump Addition
Piping Infrastruture of Modifications
Refrigerant Leak Detection