Sheraton – Chilled Water Replacement

Sheraton Denver Downtown Hotel

Denver, CO

Description

Maxson Engineering was the Prime Consultant for the replacement of the existing antiquated chilled water plant in the basement of the Sheraton Downtown Denver. The project required detailed design and planning to allow for new 1000-ton chillers to be constructed in place. The existing building conditions created a limitation that all equipment to be capable of being moved through a 6 ft. wide door.

Project Type

Chiller Plant Upgrades

Square Footage

30,000

Construction Budget

$18 million

Project Delivery Mode

Design–Build

Project Highlights:

  • Expansion of Chiller Plant

  • DDC Control Modifications

  • Pump Addition

  • Piping Infrastruture of Modifications

  • Refrigerant Leak Detection